Hi everyone,
I installed VSA yesterday 5.1 and it took 6 hours to pretty much timeout on the last step. see attach pics. Its a mess not sure if the issue is that I accidentally put a vlan on the back end which i thought i could of easily fixed if i added that vlan to teh switch but still no luck. IS there any way i can change the back and vlan to 0.
If not if I run the cleanup tool would that delete my running vm's?
Thank you