I have a customer that needs to deploy somewhere between 600-800 VMs from the same template. I know there was a post about this in the past, but I can't seem to find it. Can someone point me to a link or provide some insight on how the community is handling this? I want to be sure to keep the chain length as low as possible, but the idea behind this is to show off fast provisioning to the mgmt team and how much less time this would take than doing it through clone operations in vCenter.
↧