Good morning everyone, I've to migrate a whole infrastructure to a newly one.
what we have actually: 1 Cluster OLD managed by Vcenter in 5.0 with 3 nodes ( 2 Dell R620 and 1 Dell R710 ) connected to an Equallogic PS4000 - EVC activated -
What I've installed: 1 Cluster NEW managed by Vcenter in 5.1 with 2 nodes (1 Dell R620 and 1 Dell R720, same generation so no EVC needed) connected to the same Equallogic.
What's the best/fastest way to migrate the VMs from OLD to NEW ? Can I create a datacenter with the 2 clusters and do some Vmotion between each?
Thanks everyone for your help !